!Installer stopped answering? We support any solar system — even the ones we didn't install.Get support

Riverside County · Inland Empire

Solar in Corona, California

We have been designing, installing and servicing solar across Riverside County since 1970, and Corona is on the regular route. Same family, same phones, third generation.

A Southern California home with rooftop solar, the kind we install around Corona

Your utility here

Southern California Edison

What is actually true in Corona

Most solar quotes are built on assumptions about your street. These are the details we confirm before we model anything, because getting them wrong changes every number on the last page.

Who bills you

Southern California Edison

Your rate plan, your export credit and your interconnection paperwork all come from here. We read your actual bill rather than guessing from a zip code.

Most of Corona is on Edison, but the City of Corona Department of Water & Power serves small areas near Dos Lagos, The Crossings, Corona Pointe and Princeland. We confirm which one serves your address before designing.

Who issues the permit

City of Corona Building Division

We prepare the plan set, pull the permit and meet the inspector. Chasing City of Corona Building Division is our job, not yours.

What the roofs are like

Inland Empire

Foothill tract neighbourhoods with tile roofs and hot inland summers, in the stretch of the 91 corridor where afternoon cooling drives the bill. The split utility territory is worth checking before anyone quotes you.

How a job in Corona runs

From your bill to your first sunny morning.

Step 1

We read your bill

Your real usage from Southern California Edison, not a regional average. This is also where we find out whether solar makes sense for you yet.

Step 2

We engineer it

Roof condition, shading, panel capacity and your future plans. Solar and battery designed together, before anyone talks about price.

Step 3

We permit it

Plan set to City of Corona Building Division, interconnection application to Southern California Edison, inspection booked. Our paperwork, our phone calls.

Step 4

We install, then we stay

Most homes are physically complete in one to three days on site. After that we are still the ones who pick up when you call.

Also working near Corona

Same crew, often the same week. If your neighbours a few minutes down the road are asking the same questions, send them here.

See all service areas

Questions we get here

Corona, specifically.

Southern California Edison. That sets your rate plan, your export credit and the interconnection process, which is why it is the first thing we confirm off your bill instead of assuming.

City of Corona Building Division. We prepare the plan set, pull the permit and meet the inspector, so you are not the one making phone calls or tracking down corrections.

No, and we never have. A lease or PPA hands you two bills that both escalate, a 25-year contract attached to your house, and nothing you own at the end. We do $0-down ownership financing instead.

Then we will say so. Roof age, main panel capacity and how long you plan to stay all change the answer, and we would rather lose the sale than sell you an array that has to come back off in five years.

Get your Corona numbers

A free home energy assessment: we read your bill, look at your roof, and tell you honestly what makes sense. No lease pitch, no pressure, no obligation.

Since 1970 · 5,000+ installs · C-10 and C-46 licensed · Lic. #985340