!Installer stopped answering? We support any solar system — even the ones we didn't install.Get support

San Bernardino County · Inland Empire

Solar in Colton, California

We have been designing, installing and servicing solar across San Bernardino County since 1970, and Colton is on the regular route. Same family, same phones, third generation.

A Southern California home with rooftop solar, the kind we install around Colton

Your utility here

Colton Electric Utility

What is actually true in Colton

Most solar quotes are built on assumptions about your street. These are the details we confirm before we model anything, because getting them wrong changes every number on the last page.

Who bills you

Colton Electric Utility

Your rate plan, your export credit and your interconnection paperwork all come from here. We read your actual bill rather than guessing from a zip code.

Colton runs its own municipal electric utility, so interconnection goes through the city rather than Edison. Addresses on the unincorporated fringe can still be on Edison, which we confirm before designing.

Who issues the permit

City of Colton Building & Safety

We prepare the plan set, pull the permit and meet the inspector. Chasing City of Colton Building & Safety is our job, not yours.

What the roofs are like

Inland Empire

One of the handful of cities on our list with a municipal utility, which means a different interconnection process on a different timeline than the Edison paperwork most installers know. We have done it before.

How a job in Colton runs

From your bill to your first sunny morning.

Step 1

We read your bill

Your real usage from Colton Electric Utility, not a regional average. This is also where we find out whether solar makes sense for you yet.

Step 2

We engineer it

Roof condition, shading, panel capacity and your future plans. Solar and battery designed together, before anyone talks about price.

Step 3

We permit it

Plan set to City of Colton Building & Safety, interconnection application to Colton Electric Utility, inspection booked. Our paperwork, our phone calls.

Step 4

We install, then we stay

Most homes are physically complete in one to three days on site. After that we are still the ones who pick up when you call.

Also working near Colton

Same crew, often the same week. If your neighbours a few minutes down the road are asking the same questions, send them here.

See all service areas

Questions we get here

Colton, specifically.

Colton Electric Utility. That sets your rate plan, your export credit and the interconnection process, which is why it is the first thing we confirm off your bill instead of assuming.

City of Colton Building & Safety. We prepare the plan set, pull the permit and meet the inspector, so you are not the one making phone calls or tracking down corrections.

No, and we never have. A lease or PPA hands you two bills that both escalate, a 25-year contract attached to your house, and nothing you own at the end. We do $0-down ownership financing instead.

Then we will say so. Roof age, main panel capacity and how long you plan to stay all change the answer, and we would rather lose the sale than sell you an array that has to come back off in five years.

Get your Colton numbers

A free home energy assessment: we read your bill, look at your roof, and tell you honestly what makes sense. No lease pitch, no pressure, no obligation.

Since 1970 · 5,000+ installs · C-10 and C-46 licensed · Lic. #985340