!Installer stopped answering? We support any solar system — even the ones we didn't install.Get support

Riverside County · Pass Area

Solar in Banning, California

We have been designing, installing and servicing solar across Riverside County since 1970, and Banning is on the regular route. Same family, same phones, third generation.

A Southern California home with rooftop solar, the kind we install around Banning

Your utility here

Banning Electric Utility

What is actually true in Banning

Most solar quotes are built on assumptions about your street. These are the details we confirm before we model anything, because getting them wrong changes every number on the last page.

Who bills you

Banning Electric Utility

Your rate plan, your export credit and your interconnection paperwork all come from here. We read your actual bill rather than guessing from a zip code.

Banning runs its own electric utility, so interconnection goes through the city rather than Edison. A small number of customers in the Mias Canyon area are served by Edison over Banning lines.

Who issues the permit

City of Banning Building & Safety

We prepare the plan set, pull the permit and meet the inspector. Chasing City of Banning Building & Safety is our job, not yours.

What the roofs are like

Pass Area

A municipal utility city where the interconnection paperwork looks nothing like Edison’s. San Gorgonio Pass wind is also a genuine design factor, so mounting spec here is not boilerplate.

How a job in Banning runs

From your bill to your first sunny morning.

Step 1

We read your bill

Your real usage from Banning Electric Utility, not a regional average. This is also where we find out whether solar makes sense for you yet.

Step 2

We engineer it

Roof condition, shading, panel capacity and your future plans. Solar and battery designed together, before anyone talks about price.

Step 3

We permit it

Plan set to City of Banning Building & Safety, interconnection application to Banning Electric Utility, inspection booked. Our paperwork, our phone calls.

Step 4

We install, then we stay

Most homes are physically complete in one to three days on site. After that we are still the ones who pick up when you call.

Also working near Banning

Same crew, often the same week. If your neighbours a few minutes down the road are asking the same questions, send them here.

See all service areas

Questions we get here

Banning, specifically.

Banning Electric Utility. That sets your rate plan, your export credit and the interconnection process, which is why it is the first thing we confirm off your bill instead of assuming.

City of Banning Building & Safety. We prepare the plan set, pull the permit and meet the inspector, so you are not the one making phone calls or tracking down corrections.

No, and we never have. A lease or PPA hands you two bills that both escalate, a 25-year contract attached to your house, and nothing you own at the end. We do $0-down ownership financing instead.

Then we will say so. Roof age, main panel capacity and how long you plan to stay all change the answer, and we would rather lose the sale than sell you an array that has to come back off in five years.

Get your Banning numbers

A free home energy assessment: we read your bill, look at your roof, and tell you honestly what makes sense. No lease pitch, no pressure, no obligation.

Since 1970 · 5,000+ installs · C-10 and C-46 licensed · Lic. #985340