!Installer stopped answering? We support any solar system — even the ones we didn't install.Get support

Riverside County · Coachella Valley

Solar in Palm Desert, California

We have been designing, installing and servicing solar across Riverside County since 1970, and Palm Desert is on the regular route. Same family, same phones, third generation.

A Southern California home with rooftop solar, the kind we install around Palm Desert

Your utility here

Southern California Edison

What is actually true in Palm Desert

Most solar quotes are built on assumptions about your street. These are the details we confirm before we model anything, because getting them wrong changes every number on the last page.

Who bills you

Southern California Edison

Your rate plan, your export credit and your interconnection paperwork all come from here. We read your actual bill rather than guessing from a zip code.

Palm Desert is split between Edison and Imperial Irrigation District, and the dividing line is not published anywhere public. Confirming which utility serves your address is the first thing we do.

Who issues the permit

City of Palm Desert Building & Safety

We prepare the plan set, pull the permit and meet the inspector. Chasing City of Palm Desert Building & Safety is our job, not yours.

SolarAPP+ instant permit

What the roofs are like

Coachella Valley

Low-slope roofs and near-year-round cooling load, in a city where the utility question genuinely has two possible answers. We check the meter before we model the savings.

How a job in Palm Desert runs

From your bill to your first sunny morning.

Step 1

We read your bill

Your real usage from Southern California Edison, not a regional average. This is also where we find out whether solar makes sense for you yet.

Step 2

We engineer it

Roof condition, shading, panel capacity and your future plans. Solar and battery designed together, before anyone talks about price.

Step 3

We permit it

Plan set to City of Palm Desert Building & Safety, interconnection application to Southern California Edison, inspection booked. Our paperwork, our phone calls.

Step 4

We install, then we stay

Most homes are physically complete in one to three days on site. After that we are still the ones who pick up when you call.

Also working near Palm Desert

Same crew, often the same week. If your neighbours a few minutes down the road are asking the same questions, send them here.

See all service areas

Questions we get here

Palm Desert, specifically.

Southern California Edison. That sets your rate plan, your export credit and the interconnection process, which is why it is the first thing we confirm off your bill instead of assuming.

City of Palm Desert Building & Safety. We prepare the plan set, pull the permit and meet the inspector, so you are not the one making phone calls or tracking down corrections.

No, and we never have. A lease or PPA hands you two bills that both escalate, a 25-year contract attached to your house, and nothing you own at the end. We do $0-down ownership financing instead.

Then we will say so. Roof age, main panel capacity and how long you plan to stay all change the answer, and we would rather lose the sale than sell you an array that has to come back off in five years.

Get your Palm Desert numbers

A free home energy assessment: we read your bill, look at your roof, and tell you honestly what makes sense. No lease pitch, no pressure, no obligation.

Since 1970 · 5,000+ installs · C-10 and C-46 licensed · Lic. #985340